21
TITLE: Factors Influencing the Internationalization of Services Firms: The Case of Design, Engineering and Architecture Consulting Firms
AUTHORS: Maria R A Moreira ; Miguel A S Maia; Paulo S A Sousa ; Raquel Ch. C Meneses ;
PUBLISHED: 2013, SOURCE: 4th International Conferences on Exploring Service Science in EXPLORING SERVICES SCIENCE, IESS 2013, VOLUME: 143
INDEXED IN: Scopus WOS CrossRef: 7
22
TITLE: Theory of Constraints in the Service Sector: Characterization for Banking and Analysis of the Factors Involved in Its Adoption
AUTHORS: Julian D M Castano; Maria R A Moreira ; Paulo S A Sousa ; Raquel Ch. C Meneses ;
PUBLISHED: 2013, SOURCE: 4th International Conferences on Exploring Service Science in EXPLORING SERVICES SCIENCE, IESS 2013, VOLUME: 143
INDEXED IN: Scopus WOS CrossRef
23
TITLE: Hybrid heuristics for the single machine scheduling problem with quadratic earliness and tardiness costs
AUTHORS: Alok Singh; Jorge M S Valente ; Maria R A Moreira ;
PUBLISHED: 2012, SOURCE: INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, VOLUME: 3, ISSUE: 4
INDEXED IN: Scopus WOS CrossRef: 4
24
TITLE: Input-output control order release mechanism in a job-shop: How workload control improves manufacturing operations
AUTHORS: Do Rosario Alves Moreira, M ; Alves, RAFA;
PUBLISHED: 2012, SOURCE: International Journal of Computational Science and Engineering, VOLUME: 7, ISSUE: 3
INDEXED IN: Scopus CrossRef
25
TITLE: Genetic algorithms for single machine scheduling with quadratic earliness and tardiness costs  Full Text
AUTHORS: Jorge M S Valente ; Maria R A Moreira ; Alok Singh; Rui A F S Alves ;
PUBLISHED: 2011, SOURCE: INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, VOLUME: 54, ISSUE: 1-4
INDEXED IN: Scopus WOS CrossRef: 18
26
TITLE: A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem  Full Text
AUTHORS: Moreira, MRA ; Alves, RAFS ;
PUBLISHED: 2009, SOURCE: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 47, ISSUE: 10
INDEXED IN: Scopus WOS CrossRef: 36
27
TITLE: Greedy randomised dispatching heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties  Full Text
AUTHORS: Jorge M S Valente ; Maria R A Moreira ;
PUBLISHED: 2009, SOURCE: INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, VOLUME: 44, ISSUE: 9-10
INDEXED IN: Scopus WOS CrossRef: 10
28
TITLE: Improving the job-shop workload control through order acceptance and due-date negotiation
AUTHORS: Do Rosario, M ; Moreira, A;
PUBLISHED: 2009, SOURCE: 23rd European Simulation and Modelling Conference, ESM 2009 in ESM 2009 - 2009 European Simulation and Modelling Conference: Modelling and Simulation 2009
INDEXED IN: Scopus
29
TITLE: IMPROVING THE JOB-SHOP WORKLOAD CONTROL THROUGH ORDER ACCEPTANCE AND DUE-DATE NEGOTIATION
AUTHORS: Maria do Rosario Alves Moreira ;
PUBLISHED: 2009, SOURCE: European Simulation and Modelling Conference (ESM 2009) in EUROPEAN SIMULATION AND MODELLING CONFERENCE 2009
INDEXED IN: WOS
30
TITLE: Performance analysis of job-shop production systems under different order release control parameters
AUTHORS: Paulo S A Sousa ; Maria R A Moreira ;
PUBLISHED: 2007, SOURCE: World Congress on Engineering 2007 in World Congress on Engineering 2007, Vols 1 and 2
INDEXED IN: WOS
Page 3 of 4. Total results: 31.