221
TITLE: Dynamic MCDM with future knowledge for supplier selection
AUTHORS: Jassbi, JJ; Ribeiro, RA; Varela, LR;
PUBLISHED: 2014, SOURCE: Journal of Decision Systems, VOLUME: 23, ISSUE: 3
INDEXED IN: Scopus CrossRef
IN MY: ORCID
222
TITLE: A hybrid framework for supporting scheduling in extended manufacturing environments
AUTHORS: Santos, AS; Madureira, AM ; Varela, MLR; Putnik, GD; Abraham, A;
PUBLISHED: 2014, SOURCE: 2014 14th International Conference on Hybrid Intelligent Systems, HIS 2014 in 2014 14th International Conference on Hybrid Intelligent Systems, HIS 2014
INDEXED IN: Scopus CrossRef: 2
IN MY: ORCID
224
TITLE: Scheduling in product oriented manufacturing systems
AUTHORS: Costa, NML; Varela, MLR; Carmo-Silva, S;
PUBLISHED: 2014, SOURCE: 2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)
INDEXED IN: CrossRef
IN MY: ORCID
225
TITLE: An Ordered Approach to Minimum Completion Time in Unrelated Parallel-Machines for the Makespan Optimization
AUTHORS: Santos, ASE; Madureira, AM ; Varela, MLR;
PUBLISHED: 2014, SOURCE: 6th World Congress on Nature and Biologically Inspired Computing (NaBIC) in 2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC)
INDEXED IN: WOS DBLP
IN MY: ORCID
226
TITLE: Alternative Approaches Analysis for Scheduling in an Extended Manufacturing Environment
AUTHORS: Santos, AS; Varela, MLR; Putnik, GD; Madureira, AM ;
PUBLISHED: 2014, SOURCE: 6th World Congress on Nature and Biologically Inspired Computing (NaBIC) in 2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC)
INDEXED IN: WOS DBLP
IN MY: ORCID
227
TITLE: Comparative analysis of scheduling rules through arena for parallel machines A case study
AUTHORS: Filipa de Oliveira Teixeira; Lara Oliveira; Leonilde R Varela;
PUBLISHED: 2014, SOURCE: 6th World Congress on Nature and Biologically Inspired Computing (NaBIC) in 2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC)
INDEXED IN: WOS
IN MY: ORCID
228
TITLE: A manufacturing scheduling approach by combining simulation technique with the Hodgson’s algorithm  Full Text
AUTHORS: Pinto, T; Varela, L;
PUBLISHED: 2014, SOURCE: Mathematical Methods in Engineering
INDEXED IN: Scopus CrossRef
IN MY: ORCID
229
TITLE: A Hybrid Framework for Supporting Scheduling in Extended Manufacturing Environments
AUTHORS: Santos, AS; Madureira, AM ; Varela, MLR; Putnik, GD; Abraham, A;
PUBLISHED: 2014, SOURCE: 14th International Conference Hybrid Intelligent Systems in 2014 14TH INTERNATIONAL CONFERENCE ON HYBRID INTELLIGENT SYSTEMS (HIS)
INDEXED IN: WOS DBLP
IN MY: ORCID
230
TITLE: P2P web service based system for supporting decision-making in cellular manufacturing scheduling
AUTHORS: Maria Leonilde R Varela; Rui Barbosa; Susana Costa;
PUBLISHED: 2013, SOURCE: Intelligent Systems, Control and Automation: Science and Engineering, VOLUME: 61
INDEXED IN: Scopus CrossRef
IN MY: ORCID
Page 23 of 27. Total results: 263.