221
TITLE: An ordered approach to Minimum Completion Time in unrelated parallel-machines for the makespan optimization
AUTHORS: Santos, AS; Ana Maria Madureira ; Varela, MLR;
PUBLISHED: 2014, SOURCE: 2014 6th World Congress on Nature and Biologically Inspired Computing, NaBIC 2014 in 2014 6th World Congress on Nature and Biologically Inspired Computing, NaBIC 2014
INDEXED IN: Scopus CrossRef
IN MY: ORCID
222
TITLE: Parallel Machines Scheduling with Fuzzy Simulated Annealing
AUTHORS: Santos, AS; Varela, MLR; Ana Maria Madureira ; Ribeiro, RA;
PUBLISHED: 2014, SOURCE: 6th World Congress on Nature and Biologically Inspired Computing (NaBIC) in 2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC)
INDEXED IN: Scopus WOS DBLP CrossRef
IN MY: ORCID
223
TITLE: Scheduling in product oriented manufacturing systems Comparing hybrid flowshop with parallel-machine flowshop - an industrial study
AUTHORS: Costa, NML; Varela, MLR; Carmo Silva, S;
PUBLISHED: 2014, SOURCE: 6th World Congress on Nature and Biologically Inspired Computing (NaBIC) in 2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC)
INDEXED IN: Scopus WOS
IN MY: ORCID
224
TITLE: Distributed manufacturing scheduling based on a dynamic multi-criteria decision model
AUTHORS: Varela, MLR; Ribeiro, RA;
PUBLISHED: 2014, SOURCE: Studies in Fuzziness and Soft Computing, VOLUME: 317
INDEXED IN: Scopus CrossRef
IN MY: ORCID
225
TITLE: Dynamic MCDM with future knowledge for supplier selection
AUTHORS: Jassbi, JJ; Ribeiro, RA; Varela, LR;
PUBLISHED: 2014, SOURCE: Journal of Decision Systems, VOLUME: 23, ISSUE: 3
INDEXED IN: Scopus CrossRef
IN MY: ORCID
226
TITLE: A hybrid framework for supporting scheduling in extended manufacturing environments
AUTHORS: Santos, AS; Ana Maria Madureira ; Varela, MLR; Putnik, GD; Abraham, A;
PUBLISHED: 2014, SOURCE: 2014 14th International Conference on Hybrid Intelligent Systems, HIS 2014 in 2014 14th International Conference on Hybrid Intelligent Systems, HIS 2014
INDEXED IN: Scopus CrossRef: 2
IN MY: ORCID
228
TITLE: Scheduling in product oriented manufacturing systems
AUTHORS: Costa, NML; Varela, MLR; Carmo-Silva, S;
PUBLISHED: 2014, SOURCE: 2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)
INDEXED IN: CrossRef
IN MY: ORCID
229
TITLE: An Ordered Approach to Minimum Completion Time in Unrelated Parallel-Machines for the Makespan Optimization
AUTHORS: Santos, ASE; Ana Maria Madureira ; Varela, MLR;
PUBLISHED: 2014, SOURCE: 6th World Congress on Nature and Biologically Inspired Computing (NaBIC) in 2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC)
INDEXED IN: WOS DBLP
IN MY: ORCID
230
TITLE: Alternative Approaches Analysis for Scheduling in an Extended Manufacturing Environment
AUTHORS: Santos, AS; Varela, MLR; Putnik, GD; Ana Maria Madureira ;
PUBLISHED: 2014, SOURCE: 6th World Congress on Nature and Biologically Inspired Computing (NaBIC) in 2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC)
INDEXED IN: WOS DBLP
IN MY: ORCID
Page 23 of 27. Total results: 267.