21
TITLE: Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules  Full Text
AUTHORS: Tang, LX; Liu, JY; Rong, AY; Yang, ZH;
PUBLISHED: 2002, SOURCE: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 40, ISSUE: 7
INDEXED IN: Scopus WOS CrossRef
22
TITLE: An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling
AUTHORS: Tang, L; Liu, J; Rong, A; Yang, Z;
PUBLISHED: 2001, SOURCE: JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, VOLUME: 52, ISSUE: 10
INDEXED IN: Scopus WOS CrossRef
23
TITLE: A review of planning and scheduling systems and methods for integrated steel production  Full Text
AUTHORS: Tang, LX; Liu, JY; Rong, AY; Yang, ZH;
PUBLISHED: 2001, SOURCE: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, VOLUME: 133, ISSUE: 1
INDEXED IN: Scopus WOS CrossRef
24
TITLE: A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex  Full Text
AUTHORS: Tang, LX; Liu, JY; Rong, AY; Yang, ZH;
PUBLISHED: 2000, SOURCE: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, VOLUME: 124, ISSUE: 2
INDEXED IN: Scopus WOS CrossRef
25
TITLE: A mathematical programming model for scheduling steelmaking-continuous casting production  Full Text
AUTHORS: Tang, LX; Liu, JY; Rong, AY; Yang, ZH;
PUBLISHED: 2000, SOURCE: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, VOLUME: 120, ISSUE: 2
INDEXED IN: Scopus WOS CrossRef
Page 3 of 3. Total results: 25.