71
TITLE: Rolling-Horizon Algorithm for Scheduling under Time-Dependent Utility Pricing and Availability
AUTHORS: Pedro M Castro; Iiro Harjunkoski; Ignacio E Grossmann;
PUBLISHED: 2010, SOURCE: 20th European Symposium on Computer Aided Process Engineering (ESCAPE) in 20TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, VOLUME: 28, ISSUE: C
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
72
TITLE: Optimal Short-Term Scheduling of Large-Scale Multistage Batch Plants  Full Text
AUTHORS: Pedro M Castro; Iiro Hariunkoski; Ignacio E Grossmann;
PUBLISHED: 2009, SOURCE: INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, VOLUME: 48, ISSUE: 24
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
73
TITLE: Dinkelbach's algorithm as an efficient method to solve a class of MINLP models for large-scale cyclic scheduling problems  Full Text
AUTHORS: Fengqi Q You; Pedro M Castro; Ignacio E Grossmann;
PUBLISHED: 2009, SOURCE: COMPUTERS & CHEMICAL ENGINEERING, VOLUME: 33, ISSUE: 11
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
74
TITLE: MILP-based initialization strategies for the optimal design of water-using networks  Full Text
AUTHORS: Joao P Teles; Pedro M Castro; Augusto Q Novais;
PUBLISHED: 2009, SOURCE: CHEMICAL ENGINEERING SCIENCE, VOLUME: 64, ISSUE: 17
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
75
TITLE: Scheduling Multistage Batch Plants with Sequence-Dependent Changeovers  Full Text
AUTHORS: Castro, PM; Novais, AQ;
PUBLISHED: 2009, SOURCE: AICHE JOURNAL, VOLUME: 55, ISSUE: 8
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
76
TITLE: New Continuous-Time Scheduling Formulation for Continuous Plants under Variable Electricity Cost  Full Text
AUTHORS: Pedro M Castro; Iiro Harjunkoski; Ignacio E Grossmann;
PUBLISHED: 2009, SOURCE: INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, VOLUME: 48, ISSUE: 14
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
77
TITLE: Linear program-based algorithm for the optimal design of wastewater treatment systems  Full Text
AUTHORS: Pedro M. Castro; Joao P Teles; Augusto Q. Novais;
PUBLISHED: 2009, SOURCE: 10th Conference of Process Integration, Modelling and Optimization for Energy Saving and Pollution Reduction in CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, VOLUME: 11, ISSUE: 1
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
78
TITLE: Scheduling of a continuous plant with recycling of byproducts: A case study from a tissue paper mill  Full Text
AUTHORS: Pedro M Castro; Joakim Westerlund; Sebastian Forssell;
PUBLISHED: 2009, SOURCE: COMPUTERS & CHEMICAL ENGINEERING, VOLUME: 33, ISSUE: 1
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
79
TITLE: Optimal Design of Wastewater Treatment System through a MILP-based Initialization Procedure
AUTHORS: Joao Teles; Pedro Castro; Henrique A Matos ;
PUBLISHED: 2009, SOURCE: 12th Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction in PRES'09: 12TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, PTS 1 AND 2, VOLUME: 18
INDEXED IN: Scopus WOS
IN MY: ORCID
80
TITLE: Optimal Scheduling Under Variable Electricity Pricing and Availability
AUTHORS: Pedro M Castro; Ignacio E Grossmann; Iiro Harjunkoski;
PUBLISHED: 2009, SOURCE: 10th International Symposium on Process Systems Engineering in 10TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, VOLUME: 27, ISSUE: C
INDEXED IN: Scopus WOS CrossRef
IN MY: ORCID
Page 8 of 11. Total results: 108.