71
TITLE: A GENETIC ALGORITHM FOR PROJECT SCHEDULING IN ACTIVITY NETWORKS UNDER RESOURCE COMPLEMENTARITY
AUTHORS: Helder Silva; Jose Oliveira; Anabela Tereso;
PUBLISHED: 2011, SOURCE: 17th European Concurrent Engineering Conference (ECEC 2011) / 7th Future Business Technology Conference (FUBUTEC 2011) in ECEC' 2011:17TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE / 7TH FUTURE BUSINESS TECHNOLOGY CONFERENCE
INDEXED IN: WOS
72
TITLE: Using 3D simulation in an industry internal logistic process
AUTHORS: Pavel, V; Dias, LS; Oliveira, JA; Pereira, G;
PUBLISHED: 2008, SOURCE: 15th European Concurrent Engineering Conference, ECEC 2008 and 5th Future Business Technology Conference, FUBUTEC 2008 in 15th European Concurrent Engineering Conference 2008, ECEC 2008 - 5th Future Business Technology Conference, FUBUTEC 2008
INDEXED IN: Scopus
IN MY: ORCID
73
TITLE: Heuristic approach as a way to improve scheduling IN ERP/APS systems
AUTHORS: Koblasa, F; Dias, LS; Oliveira, JA; Pereira, G;
PUBLISHED: 2008, SOURCE: 15th European Concurrent Engineering Conference, ECEC 2008 and 5th Future Business Technology Conference, FUBUTEC 2008 in 15th European Concurrent Engineering Conference 2008, ECEC 2008 - 5th Future Business Technology Conference, FUBUTEC 2008
INDEXED IN: Scopus
IN MY: ORCID
74
TITLE: Programação de operações em sistemas com tempo de processamento variável  Full Text
AUTHORS: José Manuel Valério de Carvalho; Mª Sameiro de Carvalho; José António Oliveira;
PUBLISHED: 2002, SOURCE: Pesquisa Operacional - Pesqui. Oper., VOLUME: 22, ISSUE: 3
INDEXED IN: CrossRef
IN MY: ORCID
Page 8 of 8. Total results: 74.