Design and Construction of the Place Des Martyrs Station of the Metro Line1 of Algiers

AuthID
P-008-B9N
7
Author(s)
Conceicao, M
·
Baiao, C
·
Oliva, R
·
Prado, R
·
Hadbi, A
·
Haouchine, M
2
Editor(s)
Anagnostou, G; Ehrbar, H
Document Type
Proceedings Paper
Year published
2013
Published
in UNDERGROUND - THE WAY TO THE FUTURE
Pages: 2186-2193 (8)
Conference
World Tunnel Congress (Wtc) / 39Th General Assembly of the International-Tunnelling-And-Underground-Space-Association (Ita), Date: MAY 31-JUN 07, 2013, Location: Geneva, SWITZERLAND, Sponsors: Pizzarotti, BASF, Herrenknecht, Holcim, Implenia, Marti, Normet Int, Atlas Copco Schweiz, CIFA, Caterpillar Tunneling Canada, Elkuch Bator, Maccaferri, Mapei, ROWA Belloli, SIKA, Sandvik, Swiss IT Factory, B S, Host: Swiss Tunnelling Soc
Indexing
Publication Identifiers
Scopus: 2-s2.0-84878582088
Wos: WOS:000328113100281
Export Publication Metadata
Marked List
Info
At this moment we don't have any links to full text documens.