1
TÍTULO: Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release
AUTORES: Thurer, M; Stevenson, M; Silva, C ; Land, MJ; Fredendall, LD; Melnyk, SA;
PUBLICAÇÃO: 2013, FONTE: Production and Operations Management
INDEXADO EM: Scopus
2
TÍTULO: The ECHORD project proposals analysis - Research profiles, collaboration patterns and research topic trends  Full Text
AUTORES: Germano Veiga ; Cristovao Silva ; Ricardo Araujo; Norberto Pires ; Bruno Siciliano;
PUBLICAÇÃO: 2013, FONTE: EXPERT SYSTEMS WITH APPLICATIONS, VOLUME: 40, NÚMERO: 17
INDEXADO EM: Scopus WOS DBLP CrossRef: 4
NO MEU: ORCID
3
TÍTULO: The impact of lean manufacturing on environmental and social sustainability: A study using a concept mapping approach
AUTORES: Silva, C ; Vaz, P; Ferreira, LM;
PUBLICAÇÃO: 2013, FONTE: 6th IFAC/ACM Conference on Management and Control of Production and Logistics, MCPL 2013 in IFAC Proceedings Volumes (IFAC-PapersOnline), VOLUME: 6, NÚMERO: PART 1
INDEXADO EM: Scopus
NO MEU: ORCID
4
TÍTULO: Towards an Integrated Workload Control (WLC) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders  Full Text
AUTORES: Matthias Thuerer; Mark Stevenson; Cristovao Silva ; Martin Land;
PUBLICAÇÃO: 2013, FONTE: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 51, NÚMERO: 15
INDEXADO EM: Scopus WOS
NO MEU: ORCID
5
TÍTULO: Workload control and order release in two-level multi-stage job shops: an assessment by simulation  Full Text
AUTORES: Matthias Thuerer; Mark Stevenson; Cristovao Silva ; Martin Land; Moacir Godinho Filho;
PUBLICAÇÃO: 2013, FONTE: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 51, NÚMERO: 3
INDEXADO EM: Scopus WOS
NO MEU: ORCID
6
TÍTULO: Controlled order release: A performance assessment in job shops with sequence-dependent set-up times
AUTORES: Thurer, M; Silva, C ; Stevenson, M; Land, M;
PUBLICAÇÃO: 2012, FONTE: Production Planning and Control
INDEXADO EM: Scopus
7
TÍTULO: Improving the applicability of workload control (WLC): the influence of sequence-dependent set-up times on workload controlled job shops
AUTORES: Matthias Thuerer; Cristovao Silva ; Mark Stevenson; Martin Land;
PUBLICAÇÃO: 2012, FONTE: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 50, NÚMERO: 22
INDEXADO EM: Scopus WOS
8
TÍTULO: SIMULATION OF THE DETONATION PROCESS OF AN AMMONIUM NITRATE BASED EMULSION EXPLOSIVE USING THE LEE-TARVER REACTIVE FLOW MODEL  Full Text
AUTORES: Ribeiro, J; Silva, C ; Mendes, R; Plaksin, I; Campos, J ;
PUBLICAÇÃO: 2012, FONTE: 7th Biennial Conference of the American-Physical-Society-Topical-Group on Shock Compression of Condensed Matter in SHOCK COMPRESSION OF CONDENSED MATTER - 2011, PTS 1 AND 2, VOLUME: 1426
INDEXADO EM: Scopus WOS CrossRef
9
TÍTULO: The application of workload control in assembly job shops: an assessment by simulation
AUTORES: Matthias Thuerer; Mark Stevenson; Cristovao Silva ; George Huang;
PUBLICAÇÃO: 2012, FONTE: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 50, NÚMERO: 18
INDEXADO EM: Scopus WOS
10
TÍTULO: The performance of Due Date setting rules in assembly and multi-stage job shops: an assessment by simulation
AUTORES: Matthias Thuerer; George Huang; Mark Stevenson; Cristovao Silva ; Moacir Godinho Filho;
PUBLICAÇÃO: 2012, FONTE: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 50, NÚMERO: 20
INDEXADO EM: Scopus WOS
Página 1 de 2. Total de resultados: 20.