21
TÍTULO: An Industrial Application of Resource Constrained Scheduling for Quick Changeover
AUTORES: Sousa, RM; Lima, RM ; Carvalho, JD ; Alves, AC;
PUBLICAÇÃO: 2009, FONTE: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM 2009) in 2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4
INDEXADO EM: Scopus WOS CrossRef
22
TÍTULO: Agent based prototype for interoperation of production planning and control and manufacturing automation
AUTORES: Rui M Lima ; Rui M Sousa;
PUBLICAÇÃO: 2007, FONTE: 12th IEEE International Conference on Emerging Technologies and Factory Automation in ETFA 2007: 12TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOLS 1-3
INDEXADO EM: Scopus WOS CrossRef
23
TÍTULO: Distributed production planning and control agent-based system  Full Text
AUTORES: Lima, RM ; Sousa, RM; Martins, PJ;
PUBLICAÇÃO: 2006, FONTE: 18th International Conference on Production Research in INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 44, NÚMERO: 18-19
INDEXADO EM: Scopus WOS CrossRef
Página 3 de 3. Total de resultados: 24.