21
TÍTULO: Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules  Full Text
AUTORES: Tang, LX; Liu, JY; Rong, AY; Yang, ZH;
PUBLICAÇÃO: 2002, FONTE: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, VOLUME: 40, NÚMERO: 7
INDEXADO EM: Scopus WOS CrossRef
22
TÍTULO: An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling
AUTORES: Tang, L; Liu, J; Rong, A; Yang, Z;
PUBLICAÇÃO: 2001, FONTE: JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, VOLUME: 52, NÚMERO: 10
INDEXADO EM: Scopus WOS CrossRef
23
TÍTULO: A review of planning and scheduling systems and methods for integrated steel production  Full Text
AUTORES: Tang, LX; Liu, JY; Rong, AY; Yang, ZH;
PUBLICAÇÃO: 2001, FONTE: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, VOLUME: 133, NÚMERO: 1
INDEXADO EM: Scopus WOS CrossRef
24
TÍTULO: A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex  Full Text
AUTORES: Tang, LX; Liu, JY; Rong, AY; Yang, ZH;
PUBLICAÇÃO: 2000, FONTE: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, VOLUME: 124, NÚMERO: 2
INDEXADO EM: Scopus WOS CrossRef
25
TÍTULO: A mathematical programming model for scheduling steelmaking-continuous casting production  Full Text
AUTORES: Tang, LX; Liu, JY; Rong, AY; Yang, ZH;
PUBLICAÇÃO: 2000, FONTE: EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, VOLUME: 120, NÚMERO: 2
INDEXADO EM: Scopus WOS CrossRef
Página 3 de 3. Total de resultados: 25.